Scaffolding Runways
![Scaffolding-Runway-Houses-of-Parliment](https://www.niko.eu.com/wp-content/themes/niko/assets/images/size-helper.jpg)
![slider_scaffolding_2](https://www.niko.eu.com/wp-content/themes/niko/assets/images/size-helper.jpg)
![slider_scaffolding_4](https://www.niko.eu.com/wp-content/themes/niko/assets/images/size-helper.jpg)
![slider_scaffolding_3](https://www.niko.eu.com/wp-content/themes/niko/assets/images/size-helper.jpg)
The Scaffolding Runway System provides a solution for lifting and moving loads
throughout a scaffolding support structure.
Key features of the system:
– Clamps to existing scaffolding structure
-Lift and move loads up to 2000kg
– Cantilever over the end of the scaffolding
– Available in straight and curved sections
– Suspend a bridge from 2 runways to create a crane system
– Supplied in kit form for ease of installation, extension and relocation
Scaffolding Runway System
The System connects directly to scaffolding poles and consists of:
Track profile | Support (.B81) | Joint support (.B80) | Load trolley | End stop
Capacity:
Up to 1600kg.
NIKO Profiles:
24.000-27.000
Finish:
Zinc plated
Clamps to existing
scaffolding structure